Carried out projects

 
Installation of freon heating-cooling (VRV) systems
Installation of freon heating-cooling (VRV) systemsIn the building, which will become a modern centre of applier research, we installed freon heating-cooling (VRV) systems. The reconstructed industrial purpose building will be equipped with testing set of photovoltaic modules and solar elements, which consists of five laboratory test areas. Our company‘s specialist carried out installation works of copper pipes, heating – cooling devices, air heat pumps. More details
Installation works of fixed fire extinguishing systems
Installation works of fixed fire extinguishing systemsCircular sprinkler and fire tap systems were installed in storage-purpose building (15.872,0 m2) at Alšėnų str. 14, Kampiškių village, Kaunas district. Installation works of management valves of fixed fire extinguishing systems and fire fighting station were carried out. More details
Reconstruction of Vilnius defensive wall bastion
Reconstruction of Vilnius defensive wall bastionDuring the reconstruction of Vilnius defensive wall bastion, located in Vilnius, at Bokšto str. 20/18, installation works of ventilation, heating, water supply, sewage systems were carried out, outside water supply, household sewage and storm water networks were built. More details
Installation of solar collectors system
Installation of solar collectors systemSolar collectors system was installed in Dūkštas city boiler room. Technical work project was prepared and construction works were carried out. More details
Renovation of administrative building of Ignalina District MunicipalityDuring the renovation of administrative building of Ignalina District Municipality, located in Ignalina, at Laisvės aikštė 70, design and installation works of heating and ventilation were carried out. More details
Reconstruction of first Seimas palace of the Republic of Lithuania
Reconstruction of first Seimas palace of the Republic of LithuaniaDuring the reconstruction of first Seimas palace of the Republic of Lithuania, located in Vilnius, at Gediminio ave. 53, installation works of water supply, heating, ventilation and cooling systems were carried out. More details
Renovation of PI Šeškinės clinics
Renovation of PI Šeškinės clinicsDuring renovation of PI Šeškinės clinics, located inVilnius, at Šeškinės str. 24 , modernization of heating points and reconstruction of heating and ventilation systems were carried out. More details
Reconstruction of dormitory building
Reconstruction of dormitory buildingDormitory, located in Ignalina, at Technikos str. 10A was reconstructed in to social house. During the reconstruction heating, ventilation, water supply and sewage system installation works were carried out. More details
 
smart foreash